Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(08), 715–25.

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with Particle Swarm Optimisation and Travel Path Distance. Construction Management and Economics, 38(08), 673–88.

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(08), 756–72.

Hessami, A R, Faghihi, V, Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(08), 726–38.

Matar, M, Osman, H, Georgy, M, Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(08), 689–714.

Zhang, J, Chen, F and Yuan, X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: a Canadian study. Construction Management and Economics, 38(08), 739–55.